Remodel and Addition: Complete replacement of the existing HVAC systems and addition of new systems throughout the facility. Design included package and split system air conditioning units, depending on the availablility of space, and area usage.
Korean Baptist
Church
San Leandro, Ca.
Renovation and Addition: Complete replacement of HVAC systems
in the renovated sections of the facility. Design of new HVAC
systems in addition, including the new main sanctuary room.
Design of the kitchen HVAC, make-up and exhaust air systems,
and plumbing and piping systems.
First United Methodist
Church
Livermore, Ca.
Renovation: Addition of two HVAC systems for the building
renovation. Addition of air conditioning to the existing sanctuary.
Lakeshore
Gospel Church
Oakland, Ca.
Renovation: Addition of two HVAC systems for the building
renovation. Includes two separate systems, allowing independent
control of the second floor office area, and the first floor
sanctuary.
Lily
of the Valley Sanctuary
Oakland, Ca.
New Facility: Design of the HVAC systems for a new building.
Includes four separate systems, allowing independent control
of the office area, sanctuary, classroom/meeting areas and
the front office and lobby area.
SYDA
Facility
Oakland, Ca.
Existing Building Shell: New HVAC systems for a complete
demolition of a building shell. Design included split system
heat pumps with zone variable air volume control.