Projects: Religious Community:

   

Allen Temple (Oakland, CA)

Remodel and Addition: Complete replacement of the existing HVAC systems and addition of new systems throughout the facility. Design included package and split system air conditioning units, depending on the availablility of space, and area usage.

Korean Baptist Church (San Leandro, CA)

Renovation and Addition: Complete replacement of HVAC systems in the renovated sections of the facility. Design of new HVAC systems in addition, including the new main sanctuary room. Design of the kitchen HVAC, make-up and exhaust air systems, and plumbing and piping systems.

First United Methodist Church (Livermore, CA)

Renovation: Addition of two HVAC systems for the building renovation. Addition of air conditioning to the existing sanctuary.

Lakeshore Gospel Church (Oakland, CA)

Renovation: Addition of two HVAC systems for the building renovation. Includes two separate systems, allowing independent control of the second floor office area, and the first floor sanctuary.

Lily of the Valley Sanctuary (Oakland, CA)

New Facility: Design of the HVAC systems for a new building. Includes four separate systems, allowing independent control of the office area, sanctuary, classroom/meeting areas and the front office and lobby area.

SYDA Facility (Oakland, CA)

Existing Building Shell: New HVAC systems for a complete demolition of a building shell. Design included split system heat pumps with zone variable air volume control.